1. | The first sentence of Section 1.10 of the Employment Agreement shall be superseded by and replaced in the entirety with the following: |
2. | Section 2.1 of the Employment Agreement shall be amended to provide that beginning on April 1, 2019, the Salary shall be NIS 174,960 (one hundred and seventy-four thousand nine hundred and sixty New Israeli Shekels) and shall continue at that amount until the Transition Date. Not later than the pay period immediately following the date of this Amendment Agreement, the Company shall pay the Employee an amount necessary to retroactively give effect to the increase in Salary as if it had been in effect since April 1, 2019. |
3. | Section 3.10.1 of the Employment Agreement shall be superseded by and replaced in the entirety with the following: |
4. | Exhibit A to the Employment Agreement shall be superseded by and replaced in the entirety with Exhibit A1 hereto. |
5. | Section 3.12.3 of the Employment Agreement shall be superseded by and replaced in the entirety with the following: |
6. | Exhibit B to the Employment Agreement shall be superseded by and replaced in the entirety with Exhibit B1 hereto. |
7. | Capitalized terms used but not defined in this Amendment Agreement shall have the meaning given to such term in the Employment Agreement. |
8. | Except as specifically amended or replaced in this Amendment Agreement, the terms of the Employment Agreement shall remain in full force and effect as set forth therein. |
Company: | Employee: |
Orbotech Ltd. Signature: /s/ Bren D Higgins_______ By: Bren D. Higgins Title: Director Date: December 3, 2019 | Amichai Steimberg Signature: /s/ Amichai Steimberg______ ID#: Date: November 14, 2019 |
Revised Orbotech CY19 Annual Bonus Payout Table (includes SPTS for Q1 and Q2 only) | ||||||||
Balanced Scorecard Performance (“BSc”) | BSc Score | CY19 Non-GAAP Operating Margin ($M) Performance | ||||||
<$[**] | $[**] | $[**] | $[**] | $[**] | $[**] | $[**] | ||
Far Exceeds Expectations | 5 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Exceeds Expectations | 4 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Primarily Meets Expectations | 3 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Below Expectations | 2 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Far Below Expectations | 1 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
% of Plan | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
1- | Far Below Expectations |
A | Failure to have a Plan in place within six (6) months post-Closing with specific actions identified (to be taken both by KLA and Orbotech) which would achieve at least a [**] run rate cost savings within the two (2) years post-Closing; or |
B | Achieving less than 100% retention of the "Top 5" senior executives other than the CEO and the President/COO (specifically, [**]) through CY19; or |
C | Achieving less than 85% retention of the "Next 20" senior executives other than the CEO and the President/COO (specifically, [**]) through CY19. |
2- | Below Expectations |
A | Failure to have a Plan in place within four (4) months post-Closing with specific actions identified (to be taken both by KLA and Orbotech) which would achieve at least a [**] run rate cost savings within the two (2) years post-Closing; or |
B | Achieving less than 100% retention of the "Top 5" senior executives other than the CEO and the President/COO (specifically, [**]) through CY19; or |
C | Achieving less than 90% retention of the "Next 20" senior executives other than the CEO and the President/COO (specifically, [**]) through CY19. |
3- | Primarily Meets Expectations |
A | Having a Plan in place within four (4) months post-Closing with specific actions identified (to be taken both by KLA and Orbotech) to achieve a [**] run rate cost savings within the two (2) years post-Closing; and |
B | Achieving 100% retention of the "Top 5" senior executives other than the CEO and the President/COO (specifically, [**]) through CY19; and |
C | Achieving 90% or greater retention of the "Next 20" senior executives other than the CEO and President/COO (specifically, [**]) through CY19. |
4- | Exceeds Expectations |
A | Having a Plan in place within four (4) months post-Closing with specific actions identified (to be taken both by KLA and Orbotech) to achieve a [**] or greater run rate cost savings within two and one-half (2.5) years post-Closing, or a Plan with specific actions identified to achieve at least a [**] run rate cost savings within two (2) years post-Closing while also identifying specific actions to achieve at least [**] of such a run rate savings in CY20; and |
B | Achieving 100% retention of the "Top 5" senior executives other than the CEO and President/COO (specifically[**]) through CY19; and |
C | Achieving 95% retention or greater of the "Next 20" senior executives other than the CEO and President/COO (specifically, [**]) through CY19. |
5- | Far Exceeds Expectations |
A | Having a Plan in place within six (6) months post-Closing with specific actions identified (to be taken both by KLA and Orbotech) to achieve an [**] or greater run rate cost savings within two and one-half (2.5) years post-Closing, or a Plan with specific actions identified to achieve at least a [**] run rate cost savings within two and one-half (2.5) years post-Closing while also identifying specific actions to achieve at least [**] of such run rate savings in CY20; and |
B | Achieving 100% retention of "Top 5" senior executives other than the CEO and President/COO (specifically, [**]) through CY19; and |
C | Achieving 100% retention of "Next 20" senior executives other than the CEO and President/COO (specifically, [**]) through CY19. |
1) | Within each BSc level, 70% weight is to be given to criteria "A", 20% weight to criteria "B", and 10% weight to criteria "C” as set forth in the descriptions directly above. |
2) | KLA agrees to cooperate in the synergy process and make it a priority. |
3) | Accounting and business model changes will be limited to those necessary to achieve synergy objectives and/or to align with KLA's existing control environment; to the extent such accounting and/or business model changes might impact the achievement of OM$ and resultant Annual Bonus payout, payout levels will be adjusted accordingly and correspondingly. |
4) | Orbotech organizational changes will be kept to a minimum through CY20 and be limited to those necessary and aligned upon to achieve synergy objectives, and/or those necessary to align with KLA's existing control environment. |
5) | For purposes of defining retention, loss of an executive resulting from a death or due to a termination of an executive by Orbotech will not counted as a failure to retain. |
Revised ORBK CY19 PRSU Payout Table (includes SPTS for Q1 and Q2 only) | ||||||||
Balanced Scorecard Performance (“BSc”) | BSc Score | CY19 Non-GAAP Operating Margin ($M) Performance | ||||||
<$[**] | $[**] | $[**] | $[**] | $[**] | $[**] | $[**] | ||
Far Exceeds Expectations | 5 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Exceeds Expectations | 4 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Primarily Meets Expectations | 3 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Below Expectations | 2 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Far Below Expectations | 1 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
% of Plan | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
1- | Far Below Expectations |
A | Failure to have a Plan in place within six (6) months post-Closing with specific actions identified (to be taken both by KLA and Orbotech) which would achieve at least a [**] run rate cost savings within the two (2) years post-Closing; or |
B | Achieving less than 100% retention of the "Top 5" senior executives other than the CEO and the President/COO (specifically, [**]) through CY19; or |
C | Achieving less than 85% retention of the "Next 20" senior executives other than the CEO and the President/COO (specifically, [**]) through CY19. |
2- | Below Expectations |
A | Failure to have a Plan in place within four (4) months post-Closing with specific actions identified (to be taken both by KLA and Orbotech) which would achieve at least a [**] run rate cost savings within the two (2) years post-Closing; or |
B | Achieving less than 100% retention of the "Top 5" senior executives other than the CEO and the President/COO (specifically, [**]) through CY19; or |
C | Achieving less than 90% retention of the "Next 20" senior executives other than the CEO and the President/COO (specifically, [**]) through CY19. |
3- | Primarily Meets Expectations |
A | Having a Plan in place within four (4) months post-Closing with specific actions identified (to be taken both by KLA and Orbotech) to achieve a [**] run rate cost savings within the two (2) years post-Closing; and |
B | Achieving 100% retention of the "Top 5" senior executives other than the CEO and the President/COO (specifically, [**]) through CY19; and |
C | Achieving 90% or greater retention of the "Next 20" senior executives other than the CEO and President/COO (specifically, [**]) through CY19. |
4- | Exceeds Expectations |
A | Having a Plan in place within four (4) months post-Closing with specific actions identified (to be taken both by KLA and Orbotech) to achieve a [**] or greater run rate cost savings within two and one-half (2.5) years post-Closing, or a Plan with specific actions identified to achieve at least a [**] run rate cost savings within two (2) years post-Closing while also identifying specific actions to achieve at least [**] of such a run rate savings in CY20; and |
B | Achieving 100% retention of the "Top 5" senior executives other than the CEO and President/COO (specifically, [**]) through CY19; and |
C | Achieving 95% retention or greater of the "Next 20" senior executives other than the CEO and President/COO (specifically, [**]) through CY19. |
5- | Far Exceeds Expectations |
A | Having a Plan in place within six (6) months post-Closing with specific actions identified (to be taken both by KLA and Orbotech) to achieve an [**] or greater run rate cost savings within two and one-half (2.5) years post-Closing, or a Plan with specific actions identified to achieve at least a [**] run rate cost savings within two and one-half (2.5) years post-Closing while also identifying specific actions to achieve at least [**] of such run rate savings in CY20; and |
B | Achieving 100% retention of "Top 5" senior executives other than the CEO and President/COO (specifically, [**]) through CY19; and |
C | Achieving 100% retention of "Next 20" senior executives other than the CEO and President/COO (specifically, [**]) through CY19. |
1) | Within each BSc level, 70% weight is to be given to criteria "A", 20% weight to criteria "B", and 10% weight to criteria "C” as set forth in the descriptions directly above. |
2) | KLA agrees to cooperate in the synergy process and make it a priority. |
3) | Accounting and business model changes will be limited to those necessary to achieve synergy objectives and/or to align with KLA's existing control environment; to the extent such accounting and/or business model changes might impact the achievement of OM$ and resultant PRSU payout, payout levels will be adjusted accordingly and correspondingly. |
4) | Orbotech organizational changes will be kept to a minimum through CY20 and be limited to those necessary and aligned upon to achieve synergy objectives, and/or those necessary to align with KLA's existing control environment. |
5) | For purposes of defining retention, loss of an executive resulting from a death or due to a termination of an executive by Orbotech will not counted as a failure to retain. |
Revised ORBK CY20 PRSU Payout Table (includes SPTS for Q1 and Q2 only) | ||||||||
Balanced Scorecard Performance (“BSc”) | BSc Score | CY20 Non-GAAP Operating Margin ($M) Performance | ||||||
<$[**] | $[**] | $[**] | $[**] | $[**] | $[**] | $[**] | ||
Far Exceeds Expectations | 5 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Exceeds Expectations | 4 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Primarily Meets Expectations | 3 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Below Expectations | 2 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
Far Below Expectations | 1 | 0% | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
% of Plan | [**]% | [**]% | [**]% | [**]% | [**]% | [**]% |
1- | Far Below Expectations |
A | Support of and successful execution against Orbotech specific actions which achieve less than 80% of the run rate cost savings attributable to Orbotech that were identified in CY19, including realization of any CY19 savings if applicable; or |
B | Achieving less than 80% retention of the "Top 5" senior executives other than the CEO and the President/COO (specifically, [**]) through CY20; or |
C | Achieving less than 80% retention of the "Next 14" senior executives other than the CEO and the President/COO (specifically, [**]) through CY20. |
2- | Below Expectations |
A | Support of and successful execution against Orbotech specific actions which achieve at least 85% but less than 100% of the run rate cost savings attributable to Orbotech that were identified in CY19, including realization of any CY19 savings if applicable; or |
B | Achieving less than 80% retention of the "Top 5" senior executives other than the CEO and the President/COO (specifically, [**]) through CY20; or |
C | Achieving less than 85% retention of the "Next 14" senior executives other than the CEO and the President/COO (specifically, [**]) through CY20. |
3- | Primarily Meets Expectations |
A | Support of and successful execution against Orbotech specific actions which achieve 100% of the run rate cost savings attributable to Orbotech that were identified in CY19, including realization of any CY19 savings if applicable; and |
B | Achieving 80% retention of the "Top 5" senior executives other than the CEO and the President/COO (specifically, [**]) through CY20; and |
C | Achieving 90% or greater retention of the "Next 14" senior executives other than the CEO and President/COO (specifically, [**]) through CY20. |
4- | Exceeds Expectations |
A | Support of and successful execution/implementation against Orbotech specific actions which achieve 100% of the run rate cost savings attributable to Orbotech that were identified in CY19, including realization of any CY19 savings if applicable, and identification of an additional [**] or greater of run rate cost savings (from the baseline identified in CY19) which can be implemented within two and a half (2½) years post-Closing; and |
B | Achieving 100% retention of the "Top 5" senior executives other than the CEO and President/COO (specifically, [**]) through CY20; and |
C | Achieving 90% retention or greater of the "Next 14" senior executives other than the CEO and President/COO (specifically, [**]) through CY20. |
5- | Far Exceeds Expectations |
A | Support of and successful execution/implementation against Orbotech specific actions which achieve 100% of the run rate cost savings attributable to Orbotech that were identified in CY19, including realization of any CY19 savings if applicable, and identification of an additional [**] or greater of run rate cost savings (from the baseline identified in CY19) which can be implemented within two and a half (2½) years post-Closing; and |
B | Achieving 100% retention of "Top 5" senior executives other than the CEO and President/COO (specifically, [**]) through CY20; and |
C | Achieving 90% retention of "Next 14" senior executives other than the CEO and President/COO (specifically, [**]) through CY20. |
1) | Within each BSc level, 70% weight is to be given to criteria "A", 20% weight to criteria "B", and 10% weight to criteria "C” as set forth in the descriptions directly above. |
2) | KLA agrees to cooperate in the synergy process and make it a priority. |
3) | Accounting and business model changes will be limited to those necessary to achieve synergy objectives and/or to align with KLA's existing control environment; to the extent such accounting and/or business changes might impact the achievement of OM$ and resultant PRSU payout, payout levels will be adjusted accordingly and correspondingly. |
4) | Orbotech organizational changes will be kept to a minimum through CY20 and be limited to those necessary and aligned upon to achieve synergy objectives, and/or those necessary to align with KLA's existing control environment. |
5) | For purposes of defining retention, loss of an executive resulting from a death or due to a termination of an executive by Orbotech will not counted as a failure to retain. |